Application Fee Schedule - Wastewater Construction Permits
Regulation 61-30, Environmental Protection Fees, requires that applications for wastewater construction permits include a fee based on the type of project. A check for the applicable amount must be included with the application package. The fee schedule in the regulation is summarized below:
Collection systems (including interceptors and pump stations)
Delegated Review (domestic collection systems and industrial collection/pretreatment systems)
All Delegated Reviews | $75 |
Non-delegated review (based on sewer length)
1,000 feet or less | $100 |
1,001 feet through 9,999 | $200 |
10,000 feet or more [or pump station(s) included] | $350 |
(Note: Fee exempted for individual residential pump stations)
Treatment systems
Facilities > 1.0 MGD
New | $1,050 |
Expansion | $800 |
Modification (no expansion) | $550 |
Facilities < 1.0 MGD
New | $700 |
Expansion | $550 |
Modification (no expansion) | $400 |
Pretreatment systems
Simple systems, such as one-component systems (e.g., oil/water separators, air strippers, pH controls, etc.) | $200 |
Complex systems (such as Multi-Component systems) | $600 |