Application Fee Schedule - Wastewater Construction Permits

Regulation 61-30, Environmental Protection Fees, requires that applications for wastewater construction permits include a fee based on the type of project. A check for the applicable amount must be included with the application package. The fee schedule in the regulation is summarized below:

Collection systems (including interceptors and pump stations)

Delegated Review (domestic collection systems and industrial collection/pretreatment systems)

All Delegated Reviews

$75

 

Non-delegated review (based on sewer length)

1,000 feet or less

$100

1,001 feet through 9,999

$200

10,000 feet or more [or pump station(s) included]

$350

(Note: Fee exempted for individual residential pump stations)

 

Treatment systems

Facilities > 1.0 MGD

New

$1,050

Expansion

$800

Modification (no expansion)

$550

 

Facilities < 1.0 MGD

New

$700

Expansion

$550

Modification (no expansion)

$400

 

Pretreatment systems

Simple systems, such as one-component systems (e.g., oil/water separators, air strippers, pH controls, etc.)

$200

Complex systems (such as Multi-Component systems)

$600